Can an operational network be expanded?
Yes, after checking free ports, cable routes, addressing and existing hardware limitations.
Can installation proceed without closing the office?
Some work can be phased. Switching and possible interruptions are agreed in advance; zero downtime is not promised.
What should we prepare for an estimate?
Provide floor plans, outlet counts, floors, device types, proposed routes and speed requirements. The exact scope is clarified after a site survey.
Which documents should be agreed for structured cabling handover?
Agree on outlet diagrams, labelling, equipment lists and the line test method. If measurement reports or certification are required, define their scope and conditions before installation.